T110E3

« Back to List« Go to the U.S.A. Tech Tree
6 100 000
T110E3
In 1954, a conference on future heavy tanks was held in Detroit. Alongside other advanced projects, the Chrysler Corporation suggested a new tank on the basis of the TS-31 project. The main goal was to make the tank fit the Bern national tunnel. Several variants were considered, but the project was canceled.

155 mm AT Gun T7E2

AN/VRC-3

Continental AOI-1490

T110E3

Shell Types:

AP
APCR
HE

Equipment:

Consumables:

Tech Tree:

T95
165 000
T110E3
241 000

Firepower:

Ammunition27 (rounds)
Caliber155 (mm)
Damage750 / 750 / 1100 (HP)
Penetration295 / 375 / 90 (mm)
Rate of Fire3.33 (rounds/min)
Average Damage per Minute2500 (HP)
Shells in the Magazine  
Time for Loading Between Shots  (s)
Time for Complete Loading  (s)
Gun Loading18.00 (s)
Aiming Time2.70 (s)
Dispersion at 100 m0.36 (m)

Mobility:

Weight/Load Limit74.73 / 78.00 (t)
Engine Power875 (h.p.)
Specific Power11.71 (h.p./t)
Top Speed24 (km/h)
Reverse Speed8 (km/h)
Traverse Speed24 (deg/s)
Gun Traverse Speed26 (deg/s)

Survivability:

Hit Points1950 (HP)
Hull Armor305 / 76 / 38 (mm)

Spotting:

View Range370 (m)
Signal Range745 (m)
 

Crew:

Commander(Radio Operator)
Gunner
Driver
Loader
Loader